  1. Parking study and building configuration study for a spec GAS STATION for a potential client; I was assisting a general contractor in doing pre design studies.

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. primary balance was number of parking spaces required per building size per amount of land available; while retaining the LOOP concept for circulating vehicles; retaining 2 separate pump locations; one serving large trucks and one for smaller cars; Building was to be single story.

    ReplyDelete
  4. this also shows beginning to develop internal functional spaces (i.e. lifts) and noting square footages